INFORMATION TECHNOLOGY
COMMITTEE MEETING NOTES
April 25, 2002
Time: 10:00 – 12:00
Location: McHenry Library 481
I. Welcome and Introductions
§
Members Present:
Bob White, Pat LeCuyer, Larry Merkley, Charlie McDowell, Mark Cianca,
Kathleen Dettman, John Rodrigues, Scotty Brookie, Bob White
§
Members absent: Bruce Cooperstein, Terry Schalk, Bill
Hyder
§
Guests Present: Peter McMillan, Janine Roeth, Beth
Riddle, Tad Reynales, Magge McCue
§
Staff Present:
Max Ritchie, Fana O’Halloran
II. Cats
Overview – Pat LeCuyer
Pat presented the group with a comprehensive
overview of the services that CATS provides, including their cost, relative
health, and a future vision for those services.
After the presentation the following points were made in
response to questions:
- Capacity
to do research and development was identified as a significant
problem. CATS spends relatively
little on IT research and development.
The only area within CATS where staff is allocated specifically to
R&D is in networking. Filling
the vacant Applications Development & Support (ADS) Director position
will help some in the areas of applications systems research and
development.
- Organizations
of our size run IT divisions with annual budgets typically in the $20 to
$30 million range. CATS has a budget of roughly $12.5 million, roughly 3%
of the $380 million total budget.
UC Davis represents an example of a campus that is much larger,
with special programs including a medical school, and stronger fund sources,
and operates with an annual budget of about $38 million, plus large annual
one-time project commitments.
- The
wiring of new buildings and labs is paid for as part of construction, and
electronics are funded by network rates that are derived from the campus
community. If the laptop initiative comes to fruition, it could relieve
some costs associated with new and current labs.
- Partnerships
with the Engineering and Arts divisions help offset costs for CATS
Instructional Computing lab operations. Other partnerships are being
sought.
- The
Campus Cabling Upgrade (CCU) wiring project will be a large expense for
the campus. This will remain true even if the campus decides to install a
wireless infrastructure.
- Instructional
Computing recently completed a survey of 653 students that use various
labs on campus. One of the major issues that came out of the survey was
inadequate student computer lab availability. It was suggested that there be a designated room with
wireless access that could serve as another lab and encourage students
using laptops. This room could possibly be in the library.
- Currently
there is not enough money allocated for IT security. However, CATS is
adding an additional security administrator in the network rates next
year.
- The relatively modest level of the
proposed vision for various CATS units was noted, and Pat was asked
whether or not CATS has the resources to implement the vision
elements. In core-funded areas,
CATS can make small incremental changes, but lacks the resources for any
of the major upgrades identified in its vision. It was also noted that, if the forthcoming budget doesn't
contain funding for critical initiatives/projects, CATS would be forced
either to abandon those projects or make cuts in other areas. It is possible that revenues from
network rates, which will be discussed at the next meeting, could meet
some of these infrastructure needs.
- Pat noted that because of UCSC's
relatively small size, CATS suffers from a "reverse economy of
scale." That is, it must
implement and maintain large systems (e.g. PPS, FIS), which are a much
larger percentage of its budget than they would be for a similar
organization at a larger campus.
- There was discussion about performing a
cross-campus comparison study of central IT units, to see if CATS is
adequately resourced in a system wide context. Although developing comparable data sets may prove to be
difficult, Fana O’Halloran is beginning to work on this task.
Next steps:
- Larry
and volunteers will make visits to divisions to assess their IT
components, the Instructional Technology Group and the Network
Rates/Services Review Committee will present their findings, and the Web
Presence group will provide an update on their work. All of these will
affect CATS and will be discussed at future meetings.
- It was
suggested that a network and telecommunications advisory committee be
formed to help establish priorities and make recommendations for changes.
This will be discussed at a future meeting.
III. Wireless
Presentation – Tad
Reynales
Tad provided the group with an overview
of some possibilities for establishing a wireless infrastructure on campus.
He will provide a live demonstration at a future meeting. The same presentation
will be given to the Network Advisory Committee, who may submit a formal proposal
for the Wireless Project to ITC in the fall.
IV. Other Committee Business
- Unresolved
issues from today's discussions - Actions needed?
- New
Business?
V. Next Meeting: Thursday, May 16, 2002, 10:00-12:00, Bay Tree Conf. Room A